Page(LKI) Background Atas LKI
Logo
Other Information Preface

Preface

Other Information(LKI) Preface
Assalamu’alaikum wrwb

PT. LEMTEK KONSULTAN INDONESIA (PT LEMTEK) is an affiliated company formed in 2004 by LEMBAGA TEKNOLOGI FAKULTAS TEKNIK UNIVERSITAS INDONESIA (LEMTEK UI) in order to develop business consulting services that already exist become more offensive in the public sector and industry by utilizing the resources and networkings owned by LEMTEK UI. PT LEMTEK provides professional consulting services covering: study, survey, technical audits, planning, design, engineering, project/construction management and training. The field of services including: urban and regional, building and infrastructure, transportation, energy, oil & gas, mineral minning, environment, water resources, telecommunication and information technology.

As an affiliated company of LEMTEK UI, PT LEMTEK is also supported by professional experts and laboratory facilities from all departments in the Faculty of Engineering University of Indonesia, including civil engineering, mechanical engineering, electrical engineering, metallurgical engineering, chemical engineering, industrial engineering, environmental engineering and architecture. It enhances PT LEMTEK capabilities and competitiveness in providing consulting services.

PT LEMTEK has been growing rapidly and actively participate in the development in Indonesia especially in the field of engineering and management consulting services, and has a lot of cooperation with the central as well as local government, and private companies nationally/internationally.

Wassalamu’alaikum wrwb

Jakarta, September 2016
Dr. Ir. Wisnu Isvara, MT
President Director
 Project Experiences

Project Experiences

Project Owner : PT. Jasa Marga (Persero) Tbk
Consultancy Service of Master Plan and Detailed Spesification Development of Information and Communication System Equipment
Project Owner : Pertamina Hulu Energy ONWJ
TP ORF E&I Cable Remaining Life Assessment
Project Owner : Pertamina Hulu Energy ONWJ
Structure Integrity Assessment for BF Platform
Project Owner : Pertamina Hulu Energy ONWJ
Study of The Use of Chemicals in Offshore North West Java
Project Owner : Pertamina Hulu Energy ONWJ
Material Test For JIS 350 x 175 x 11 x 6 (Resv 145875)
Project Owner : Pertamina Hulu Energy ONWJ
Composite Wrapping Test as per ASME PCC-2
Project Owner : Pertamina Hulu Energy ONWJ
Structural Integrity Assesment for LPRO Platform
 News And Events

News And Events

04
June
Comparative Performance Test of Gasoline
Lemtek UI was appointed by PT Pertamina (Persero) through the Corporate Marketing Directorate to conduct comparative test and determine the performance of a car engine using a variety of gasoline produced by Pertamina and non-Pertamina. The parameters of the performance included engine power, torque, maximum speed, acceleration, gas emissions, fuel consumption, and cleanness of engine fuel chamber [...]
01
June
Iftar Ramadhan at Lemtek UI
Lemtek UI held the Iftar dinner to break the fast of Ramadhan together this year on 31 May 2018 at Lemtek UI Salemba office. This event was attended by Prof Dr Dedi Priadi and Dr Wisnu Isvara as Director and General Manager of Lemtek UI [...]
16
May
Design of the Crisis Control Center and Workshop Buildings of BNPT
The National Agency for Combating Terrorism (Badan Nasional Penanggulangan Terorisme/BNPT) finally appointed PT Lemtek Konsultan Indonesia after the tender processs, as Consultant to make a design of the Crisis Control & Analysis Center and Workshop Buildings of BNPT in Indonesia Peace Security Center Area at Sentul Bogor [...]
22
April
Basic Design of Banyuwangi Airport Development
On 12 April 2018 Lemtek UI was invited by the Procurement & Logistic team of PT. Angkasa Pura 2 to carry out clarification and negotiation of Basic Design Work of Banyuwangi Airport Development Proposal [...]
20
April
BPH Migas Discussion Forum
On 19 April 2018, Lemtek UI was invited by Downstream Regulatory Body - Oil & Gas (BPH Migas) in the discussion forum to review draft regulation of the project plan and investment control of gas transmission pipeline construction [...]
19
March
PHE ONWJ Contract Performance Evaluation
Lemtek UI through PT Lemtek Konsultan Indoensia has been conducting a special study, research and integrity assessment as blanket contract in Pertamina Hulu Energy Offshore North West Java (PHE ONWJ) since 8 months ago. Scope of works of this project are to perform studies, research, specialty engineering and integrity assessment of PHE ONWJ's production facilities [...]
13
March
Financial Statement 2017 Audit Report
n the context of transparent and accountable financial management, Lemtek UI has appointed the Registered Public Accounting Firm Krisnawan, Nugroho & Fahmy (KNF) to audit the Lemtek UI financial statements 2017. On 12 March 2018, KNF presented the audit report to the Lemtek UI management [...]
13
March
The Study & Survey on Southern Runway & Taxiway Slab of Soetta Airport
Once again PT Angkasa Pura 2 Soekarno Hatta Airport Branch Office assigned Lemtek UI to conduct study and survey on the existing slab condition of runway and taxiway of Soetta Airport. Previously Lemtek UI had studied the runway and taxiway slab conditions on the north side, now on the south side of Soetta Airport [...]