Page Background Atas bg 1440 x 455 repeat f705b 2517 50
Logo
 Project Experiences yg kehapus

Project Experiences

Project Owner : PT. PJB
Consulting Service for Biomass and PLTBM
Project Owner : PT. Indonesia Power UPJP Perak Grati
Root Cause Failure Analysis of Trafo Interference of GT 1.2 & 1.3 UPJP Perak Grati
Project Owner : PT. PLN Pembangkitan Tanjung Jati B
Energy Audit of PLTU Tanjung Jati B unit 3 & 4
Project Owner : Rokan Hulu Regency
Development of Detailed Spatial Planning of Rokan Hulu Regency
Project Owner : PT. Wijaya Karya (Persero) Tbk
Analysis of Lateral Load Test Results
Project Owner : PT. PLN (Persero) Pusat Enjiniring Ketenagalistrikan
Detailed Design and Calculation Methods of Tower Transmission and Substation Foundation
Project Owner : PT. PLN (Persero) Kantor Pusat
Feasibility Study of PLN Tower Development
Project Owner : PT. Pertamina (Persero)
Predicting Models of Piping / Pipeline Materials For CO2 EOR / CCS Project For Development of Material Selection Modules for Tubing / CO2 Casing EOR / CCS Program (Model OCLC 02)
Project Owner : PT. Pertamina
Fuel Performance Comparative Test
Project Owner : PT. Angkasa Pura II (Persero)
Basic Design of Banyuwangi Airport Development