Page Background Atas bg 1440 x 455 repeat f705b 2517 50
(021) 3907401 / (62) 8118019760
Senin- Jumat 08.00 am - 17.00 pm
Logo
 Project Experiences yg kehapus

Project Experiences

Project Owner : PT. Indonesia Power UBP Tanjung Priok
Root Cause Analysis of Gear Box-Fuel Gas Compressor
Project Owner : PT. Indonesia Air Water
Study of Palm Oil Collecting Equipment
Project Owner : PT. Gedung Bank Exim
Structural Assessment of Podium Roof Plaza Mandiri Building
Project Owner : Faculty of Administrative Sciences, University of Indonesia
Masterplan and Design of Faculty of Administrative Sciences Universitas Indonesia Building Development
Project Owner : PT PLN (Persero) UPP pembangkit Jawa Bagian Barat 2
Tide Level Measurement, Topography and Geospatial Survey of PLTGU Muara Karang (400-500) MW
Project Owner : PT. Multimas Nabati Asahan
Feasibility Study of General Terminal Concession
Project Owner : PT. Transportasi Jakarta
Grand Design of Small Bus Integration
Project Owner : PT. Prima Layanan Nasional Enjiniring
Selection Recruitment of PT. PLN Enjiniring 2017
Project Owner : PT. PP Energi & PT. Surya Tirta Energi Lestari
Preliminary Study of 100 MW Gas Power Plant (Base Load) with Terminal Facility for Gas Receiver in Palu City
Project Owner : PT. Medco E & P
Feasibility Study of 20 KV Low Voltage Cables Installation from Batanghari Leko to Lica Station in SSB Asset