Project Experiences

Project Owner : PT. PLN (Persero) JE
The study Area Sedimantasi Dredging Puddle Besai HYDROELECTRIC POWER PLANT (2184A)
Project Owner : Dinas PU Prov. DKI Jakarta
Execution of Road Roughness Conditions Data Updating, on a Secondary arterial road in 2008
Project Owner : PT. Pertamina EP Cepu
ITB Document for FEED study "Crude Oil Pipeline – Storage Tanks – SPM, Banyu Urip – Sowan Project".
Project Owner : PT. Pertamina EP Cepu
Additional Advanced Topographic Mapping pipelines and 20 ", 60 km x 12 m – Banyu Urip Project.
Project Owner : PT. Bukit Asam
Animated scale model making services & Tahura Enim (package 08-069)
Project Owner : PT. Indonesia Power
Assement Roro Jetty SPJ
Project Owner : PT. Pertamina EP Cepu
Additional Mapping the topography of Pipeline 20 ", 60 km x 12 m – Banyu Urip Project.
Project Owner : PT. (Persero) Pelabuhan Indonesia II Cab., Sunda Kelapa
The Consultant Preparing The Feasibility Study On The Development Plan Of The Apron Heading VI Port Of Sunda Kelapa
Project Owner : PT. PLN Distribusi Jakarta Raya dan Tangerang
Manufacture Of Electric Power Supply Design Development To The Marunda
Project Owner : PT. Pertamina EP Regian Sumatera
Evaluation of Engineering and QA/QC Builders/Repair SPM # 6 (SO. 1131) BP West Java for use on the Pangkalan Susu