Project Owner : PT. Timah, Tbk
Masterplan for the Belinyu Heritage Area and the Timah Indonesia Belinyu Museum
Project Owner : PT. Toyota Motor Manufacturing Indonesia
DED of structural improvement and strengthening of the Plant 1 Head Office Building
Project Owner : PT. Pertamina (Persero)
Feasibility Analysis Study of Using Bright Gas Cylinder Sleeve Cover on 5.5 Kg Bright Gas Cylinder
Project Owner : PT. Dwimitra Barto Engineering
Review of the Calculation Results of the Column Improvement at the PLN Poncol Bekasi GIS Development Project
Project Owner : PT. PLN (Persero) Pusat Enjiniring Ketenagalistrikan
Field Investigation Study of the 500 Kv Bojanegara – Balaraja Reconductoring
Project Owner : Badan Aksesibilitas Telekomunikasi Dan Informasi Kementerian Komunikasi dan Informasi
Study of BTS Multiyears Project 2020
Project Owner : PT. PLN (Persero) Unit Induk Pembangkitan Sumatera Bagian Utara
Calculation Study Services for Engineering Cost Estimate for Power Plant Relocation
Project Owner : PT. Indonesia Power
Consulting Service of Nusa Peninda Bali Hybrid PLTS Development Project
Project Owner : PT. Indonesia Power
Consulting Service of Nusa Peninda Bali Hybrid PLTS Development Project
Project Owner : Dinas SDA DKI Jakarta
Hydrological Survey and Analysis of Kamal Muara Polder System in the DKI Jakarta Rob Control and Coastal Development Sector